[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"estate-page-about-lhn-food-chain.html-main":3},{"data":4},{"building":5,"active_tab":26,"tabs":27,"seo":42,"content":45,"updated_at":60},{"slug":6,"url":7,"can_email":8,"can_email_managing_agent":8,"name":9,"property_label":10,"season_parking_url":11,"managing_agent_url":11,"website_url":11,"latitude":12,"longitude":13,"nearest_station":11,"nearby_stations":14,"main_mc":11,"subsidiary_mcs":15,"redeveloped_into":16,"redeveloped_from":17,"management_phone":11,"content_kind":18,"is_new_launch":8,"launch_details":11,"structured":19,"photos":25},"lhn-food-chain","\u002Flhn-food-chain.html",false,"LHN Food Chain","Industrial B2",null,1.3173667,103.6288385,[],[],[],[],"development",{"mcst_no":20,"development_name":9,"location":21,"district":22,"mc_contact":11,"mc_contact_note":11,"mc_contact_2":11,"mc_contact_3":11,"mc_contact_4":11,"security_contact":11,"concierge":11,"fire_command_centre":11,"mc_email":11,"fax":11,"mc_address":23,"developer":11,"managing_agent":11,"managing_agent_contact":11,"leasing_contact":11,"season_parking":11,"website":11,"uen":24},"4960","55 Tuas South Avenue 1","D07 — Bugis, Golden Mile, Middle Road","75 Beach Road #04-01 Singapore 189689","T25MC0018L",[],"about",[28,31,35,38],{"key":29,"label":30,"url":7},"main","Management Office",{"key":32,"label":33,"url":34,"sitemap":8},"directory","Directory","\u002Fdirectory\u002Flhn-food-chain.html",{"key":26,"label":36,"url":37},"About","\u002Fabout-lhn-food-chain.html",{"key":39,"label":40,"url":41,"sitemap":8},"listings","Listings","\u002Flistings-lhn-food-chain.html",{"title":43,"description":44,"canonical":37,"robots":11},"LHN Food Chain: Factory Layout and Tuas South Surroundings","Read about LHN Food Chain’s factory layout, loading facilities and Tuas South setting, with practical checks for food-business premises.",{"about_html":46,"nearby":47},"\u003Cp>\u003Cimg src=\"https:\u002F\u002Fapi6.estate.sg\u002Fstorage\u002Feditorial\u002Flhn-food-chain-editorial-5761f82834ed.png\" width=\"1536\" height=\"1024\" alt=\"AI-inspired watercolour of an imagined grey industrial food-factory building with orange accents and roadside trees, inspired by LHN Food Chain; not an exact depiction.\">\u003C\u002Fp>\n\u003Cp>\u003Cem>AI-inspired conceptual illustration of LHN Food Chain — not a site photograph, architectural drawing or precise as-built representation.\u003C\u002Fem>\u003C\u002Fp>\n\u003Ch2>A food-production development in Tuas South\u003C\u002Fh2>\n\u003Cp>LHN Food Chain is a nine-storey industrial development at 55 Tuas South Avenue 1, arranged for multiple food-processing businesses. LHN Limited’s 2024 annual report records 49 food-factory units and confirms that the project obtained its Temporary Occupation Permit in September 2024.\u003C\u002Fp>\n\u003Cp>The building represents a change of use within an established industrial property. LHN’s earlier corporate listing identifies the address as Sunhuan Building, while its subsequent business update describes the conversion of the nine-storey building into a multi-user food-processing development. The unit count describes the development’s accommodation, rather than the number of businesses currently operating there.\u003C\u002Fp>\n\u003Ch2>Units and production infrastructure\u003C\u002Fh2>\n\u003Cp>LHN’s current property information describes spaces for food production, processing, packaging, storage and distribution. Listed provisions include floor and grease traps, fresh-air ducts, kitchen-exhaust provisions and attached washrooms. The published door arrangements distinguish first-storey roller shutters from doors serving upper-storey units.\u003C\u002Fp>\n\u003Cp>These features provide a starting point for inspecting a unit. A prospective occupier should compare the position of drainage and exhaust connections with the proposed kitchen or production layout, and check how equipment would be brought in. Floor area alone does not establish how much space remains after cold rooms, preparation zones, packaging, staff circulation and storage are accommodated.\u003C\u002Fp>\n\u003Ch2>Loading and shared circulation\u003C\u002Fh2>\n\u003Cp>The project information identifies dedicated loading bays and separate cargo lifts for raw and cooked food. For businesses receiving ingredients and dispatching finished products, the route between the loading area, lift and factory entrance is an important part of the premises assessment.\u003C\u002Fp>\n\u003Cp>Walk those routes during a viewing. Confirm the lift dimensions and loading limits against the actual equipment, pallets or trolleys to be used. Ask management about loading-bay allocation, delivery hours, booking arrangements and responsibility for cleaning shared areas. A building-level provision should be checked against the selected unit’s access and current operating rules.\u003C\u002Fp>\n\u003Ch2>Surroundings and staff access\u003C\u002Fh2>\n\u003Cp>The address places LHN Food Chain in Tuas South’s industrial setting. The broader area also serves port-related activity: the Maritime and Port Authority records that Tuas Port’s first two berths began operations in December 2021. That regional context is useful for understanding the location, but a delivery plan still needs to be tested against actual suppliers, customers and vehicle routes.\u003C\u002Fp>\n\u003Cp>\u003Ca href=\"https:\u002F\u002Fwww.estate.sg\u002Ffood-ascent.html\">Food Ascent\u003C\u002Fa>, at 45 Tuas South Avenue 1, is another food-factory development on the same avenue. Businesses comparing the two should examine the specific loading and unit-access arrangements at each property rather than assume that their layouts are interchangeable.\u003C\u002Fp>\n\u003Cp>For staff travel, Tuas West Road MRT station is on the East–West Line’s Tuas West Extension. Check the onward connection to the factory for the intended shift times, including the final pedestrian approach. A regional rail connection does not by itself establish a convenient walk to the entrance.\u003C\u002Fp>\n\u003Ch2>Checks before fitting out or occupying a unit\u003C\u002Fh2>\n\u003Cp>Food operations need to be assessed for the particular premises and activity. SFA’s application process includes supporting material such as layout plans, process-flow charts and product particulars, with assessment and site inspection forming part of the licensing process. Confirm the appropriate licence or registration before committing to a fit-out.\u003C\u002Fp>\n\u003Cp>Bring the proposed equipment schedule and workflow to discussions with the landlord, management and relevant specialists. Verify electrical capacity, floor loading, ventilation, waste handling and any proposed cold-storage installation. Obtain the unit documents and current management charges, and clarify which installations belong to the landlord or occupier and who maintains them. The building’s TOP and food-factory designation do not replace these operational checks.\u003C\u002Fp>\n\n\u003Ch2>Sources\u003C\u002Fh2>\n\u003Cul>\n\u003Cli>\u003Ca href=\"https:\u002F\u002Fwww.hkexnews.hk\u002Flistedco\u002Flistconews\u002Fsehk\u002F2024\u002F1230\u002F2024123001825.pdf\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">LHN Limited Annual Report 2024\u003C\u002Fa>\u003C\u002Fli>\n\u003Cli>\u003Ca href=\"https:\u002F\u002Flinks.sgx.com\u002FFileOpen\u002FSlides%201QFY2025%20Business%20Updates%20e%20sgx.ashx?App=Announcement&amp;FileID=835727\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">LHN 1QFY2025 business updates\u003C\u002Fa>\u003C\u002Fli>\n\u003Cli>\u003Ca href=\"https:\u002F\u002Flhngroup.com\u002Fproperties\u002F55-tuas-south\u002F\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">LHN legacy 55 Tuas South listing\u003C\u002Fa>\u003C\u002Fli>\n\u003Cli>\u003Ca href=\"https:\u002F\u002Flhnspace.com.sg\u002Ffind-space\u002Flhn-food-chain\u002F\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">LHN Space: LHN Food Chain\u003C\u002Fa>\u003C\u002Fli>\n\u003Cli>\u003Ca href=\"https:\u002F\u002Fwww.mpa.gov.sg\u002Fmaritime-singapore\u002Fport-of-the-future\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">MPA: Port of the Future\u003C\u002Fa>\u003C\u002Fli>\n\u003Cli>\u003Ca href=\"https:\u002F\u002Fwww.lta.gov.sg\u002Fcontent\u002Fltagov\u002Fen\u002Fgetting_around\u002Fpublic_transport\u002Frail_network\u002Feast_west_line.html\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">LTA: East–West Line\u003C\u002Fa>\u003C\u002Fli>\n\u003Cli>\u003Ca href=\"https:\u002F\u002Fwww.sfa.gov.sg\u002Ffood-manufacturing-storage\u002Flicence-registration\u002Fapplication-process-fees-for-licence-registration-for-food-manufacturing-storage\" rel=\"nofollow noopener noreferrer\" target=\"_blank\">SFA: Food manufacturing and storage application process\u003C\u002Fa>\u003C\u002Fli>\n\u003C\u002Ful>",{"schools":48,"amenities":49},[],{"chas_clinic":50},{"label":51,"icon":52,"radius_m":53,"items":54},"CHAS clinics","🩺",800,[55],{"name":56,"address":57,"phone":58,"metres":59},"Tuas View Medical Centre","70 Tuas South Avenue 1","8306 5590",597,"2026-09-26T08:51:15.000000Z"]