
AI-generated architectural illustration interpreting a historical project render; not an as-built photograph or measured representation.
Mountbatten Lights on Mountbatten Road
Mountbatten Lights is a landed residential development along Mountbatten Road. SLA’s OneMap identifies the development at 737 Mountbatten Road and lists separate addresses from 737A to 737D. View the location on OneMap.
A four-house cluster development
A CoAssets announcement dated 17 August 2015 describes Mountbatten Lights as a cluster-bungalow project comprising four detached houses, developed by Chia Quee Khee. The company’s September 2016 investor presentation identifies Mountbatten Lights Pte Ltd (Singapore) as the developer. CoAssets announcement, page 1; investor presentation, page 33.
BCA’s management-corporation record lists MCST 4500 with four strata lots and a constitution date of 25 May 2017. That date records the formation of the management corporation, not the project’s completion. BCA MCST dataset.
The historical design
The presentation’s project render shows low-rise houses with dark pitched roofs, pale wall panels, strong dark framing, upper balconies and extensive glazing. The illustration accompanying this guide interprets that historical design; it is not a photograph of the completed development. Neither the render nor the announcement establishes today’s finishes or a shared-facilities schedule.
The 2015 announcement forecast completion in early 2016. A forecast does not confirm the actual completion or occupation-permit date, so this guide does not state one.
Neighbourhood green space
Katong Park provides public green space at the junction of Meyer Road and Fort Road. NParks describes the 4.12-hectare heritage park and its excavated South-East Bastion of Fort Tanjong Katong. This is a neighbourhood destination, separate from Mountbatten Lights’ grounds. NParks visitor information.
Rail connections
Katong Park is on the Thomson–East Coast Line. LTA’s Stage 4 opening information confirms that this stretch began passenger service in June 2024, replacing the future-station descriptions still found in older property marketing. Use current station information and the route from the actual entrance when planning a journey; no fixed walking time is claimed here. LTA’s Stage 4 information.
For this development’s recorded management details, return to the Mountbatten Lights management page.
